Completed Coquitlam West, Coquitlam

638 Whiting Way, Coquitlam, BC

4 Beds 44 Floors 296 Units

Details

Building Name
VUE
Year Built
2024
Total Units
296

Description

Vue is a new condo and townhouse development by Amacon currently under construction at 638 Whiting Way, Coquitlam. The development is scheduled for completion in 2024 and has a total of 296 units.

This vibrant community boasts a wide range of sophisticated 1, 2, 3 and 4 bedroom homes, a boutique collection of Townhomes and a row of two-storey Live-Work loft-style units – complete with street-entry storefronts. What else does Vue offer? A beautifully landscaped ground-level public plaza encompassing a retail space – perfectly located just steps from home. It’s an active, energized streetscape where daily life is rich with possibility.

Location

Amenities

  • Yoga Studio
  • Social Lounge
  • Outdoor BBQ Area
  • Guest Room
  • Outdoor Gas Fire Pit
  • Pool
  • Music Room
  • Community Garden
  • Children's Play Area
  • Fitness Facility
  • Meeting Room

Features

  • Stylish spaces
  • Laminate plank flooring
  • Sleek roller shades
  • Bedroom closets
  • Spacious bathrooms

Developer

Amacon

Sales Status

Completed

Architect

Chris Dikeakos Architects Inc.

Interior Designer

Portico Design Group